Application and protection of construction machinery during the running-in period

1. Since the construction machinery is a special vehicle, the operating staff should receive training and leadership from the manufacturer, have sufficient understanding of the structure and performance of the machine, and obtain certain operation and maintenance experience before operating the machine. The product use protection explanation book provided by the manufacturer is the necessary material for the operator to operate the equipment. Before operating the machine, you must first browse the use protection explanation book, operate and maintain according to the request of the explanation book.

2. Pay attention to the work load during the running-in period. The work load during the running-in period should generally not exceed 80% of the rated work load, and proper workload should be deployed to prevent overheating caused by the machine’s long-term continuous operation.

3. Pay attention to frequently check the instigation of each instrument, if it is abnormal, stop it in time to eliminate it, and end the operation before the cause is not found and the fault is not eliminated.

4. Pay attention to frequently reviewing lubricating oil, hydraulic oil, coolant, brake fluid, and fuel oil (water) level and character, and pay attention to reviewing the seal of the whole machine. During the inspection, it was found that there was too much oil and water, and the reasons should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period (except for special requests).

5. Keep the machine clean, adjust and tighten loose parts in time to prevent the loose parts from aggravating the wear of the parts or causing the loss of the parts.

6. The running-in period is stopped, the machine should be forced to maintain, review and adjust work, and pay attention to the exchange of oil.