t/c radiator pipe for XCMG ZL50G/ZL50GL Wheel Loader

Short Description:

Hydraulic oil cooler pipeline assembly is the connecting pipeline for hydraulic oil cooling circuit of XCMG ZL50G and ZL50GL wheel loaders.

Product Detail

Product Tags

description

This dual variator oil cooler pipeline assembly is manufactured strictly according to the original pipeline layout, installation dimensions and flange interface of XCMG ZL50G / ZL50GL wheel loader, supporting direct replacement without cutting, bending or modifying pipe joints. The hard pipe adopts cold-drawn seamless steel tube, formed by automatic argon arc welding, with sand blasting and anti-rust paint treatment on the outer surface to enhance corrosion resistance. The flexible hose uses multi-layer steel wire braided reinforcement structure, which can compensate assembly deviation and absorb frame vibration to reduce welding seam fatigue cracking. The complete pipeline assembly includes oil inlet pipe, return pipe, pipe clamps, flange connectors, sealing gaskets and auxiliary fittings. The inner wall of pipeline is smooth with low flow resistance, which reduces back pressure of the cooling circuit. The pipeline layout avoids sharp bends and local throttling, effectively prevents oil temperature rise caused by flow resistance. It has excellent resistance to transmission oil corrosion, pressure impact and long-term vibration fatigue, maintaining reliable sealing under continuous heavy-load digging and earthmoving working conditions.

product parameters

Product Name:Dual Variator Oil Cooler Pipeline Assembly
Applicable Model:XCMG ZL50G, ZL50GL Wheel Loader
Pipeline Composition:Cold drawn seamless steel hard pipe + multi-layer steel wire braided rubber hose
Nominal Working Pressure:3.5MPa
Burst Pressure:10.5MPa
Working Medium:Transmission oil for torque converter & gearbox
Operating Temperature:-30℃ ~ +110℃
Pipe Connection Type:Flange connection
Surface Treatment of Steel Pipe:Sand blasting + anti-rust paint coating
Sealing Material:High temperature resistant nitrile rubber gasket
Installation Method:Fixed by pipe clamp, direct replacement
Feature:Vibration absorption, low flow resistance, high temperature resistance, anti-fatigue cracking, stable sealing

Applicable Scenarios

Open-pit mining, aggregate stockyard loading, earthwork road construction, port bulk cargo handling, quarry mining, bulk material transfer, municipal engineering, river dredging project.

advantage

- Combined structure of steel hard pipe and flexible rubber hose, rigid pipe keeps pipeline shape, hose absorbs frame vibration, reduce fatigue cracking risk at welding positions.
- Smooth inner pipe wall, low flow resistance, reduce cooling circuit back pressure, guarantee stable circulation of transmission oil and improve heat dissipation efficiency of dual variator system.
- Multi-layer steel wire braided hose and high-temperature resistant nitrile rubber seal, good resistance to transmission oil corrosion and pressure pulse, effectively prevent oil leakage under high oil temperature.
- Strict welding and surface anti-corrosion treatment for steel pipes, strong rust resistance, adapt to dusty, humid construction site environment, extend pipeline service life.
- Complete assembly with pipe clamps, gaskets and joints, one-piece delivery, convenient for on-site maintenance and rapid replacement.
- Reasonable pipeline layout without sharp bends, reduce air accumulation inside the loop, avoid local overheating and cavitation of dual variator system, protect clutch friction plates.

FAQ 

Q1: Is this dual variator oil cooler pipeline assembly compatible with both ZL50G and ZL50GL?
A1: Yes. This pipeline assembly is customized for XCMG ZL50G and ZL50GL wheel loaders. Pipe layout, flange size and connector specifications are universal for the two models.

Q2: What are typical symptoms that the dual variator oil cooler pipeline needs to be replaced?
A2: Oil leakage at welding seam or hose joint, hose bulging, cracks and oil seepage, hard pipe serious corrosion or deformation, pipeline blockage which leads to continuous high transmission oil temperature and power weakness during shoveling.

Q3: What routine maintenance should be carried out for dual variator oil cooler pipeline?
A3: Regularly inspect pipeline surface for cracks, swelling and oil leakage; check tightness of pipe clamps and flange bolts; avoid external collision and extrusion of pipeline; keep pipeline surface clean, regularly check transmission oil quality.

Q4: Is pressure test and leakage inspection carried out before delivery?
A4: Every pipeline assembly will pass hydraulic pressure test and sealing leakage inspection before leaving factory to ensure no leakage under rated working pressure.

Q5: Can high-pressure water gun directly wash the dual variator oil cooler pipeline?
A5: Not recommended. High-pressure water may impact the hose surface and sealing joints, accelerate aging of rubber parts. Clean dust with compressed air or wet rag.

Q6: What hazards will occur if the pipe clamp is loose for a long time?
A6: Loose pipe clamps will cause pipeline shaking and resonance during operation, resulting in fatigue fracture of welding seams or hose joints, leading to sudden transmission oil leakage, power drop and affecting machine safety.

our warehouse

our warehouse

Pack and ship

Pack and ship




  • Previous:
  • Next:

  • Write your message here and send it to us