200637888 Frame welding for XCMG RP705 paver spare parts

Short Description:

Frame Weldment, Part No.200637888, fits XCMG RP705 medium tracked paver. It is the core load-bearing structural component between the chassis and working attachment.

Product Detail

Product Tags

description

This 200637888 frame weldment is matched for the XCMG RP705 medium tracked paver, belonging to the structural load-bearing category. The RP705 uses tracked travel, full hydraulic drive, and a hydraulic telescoping screed. The frame serves as the machine skeleton, connecting the left/right crawler bogies, carrying the hopper and power system, and transmitting traction and paving reaction forces. Frame weld quality and structural integrity directly affect travel stability, paving smoothness, and service life.
The frame weldment is manufactured to RP705 OEM structural dimensions, plate thickness, and weld requirements, matching the crawler bogie mounting interfaces, hopper hinge points, and screed tow arm connection positions. Key stress areas such as crawler bogie mounting seats, tow arm hinge zones, and hopper support areas use reinforced structures and full penetration welding to improve fatigue and deformation resistance. The surface is anti-rust treated for asphalt heat, dust, and outdoor paver operating conditions.
If the frame experiences weld cracking, structural deformation, or mounting hole wear, crawler bogie positioning may shift, tow arm movement may become abnormal, and paving smoothness may decrease, affecting travel safety in severe cases. When purchasing, use part number 200637888 as the identification reference and confirm compatibility with the RP705 model.

product parameters

Product Name: Frame Weldment
Part No.: 200637888
Applicable Model: XCMG RP705 Medium Tracked Paver
Type: Structural load-bearing weldment
Function: Connects crawler bogies, carries hopper and power system, transmits traction and paving reaction forces
Body Material: High-strength structural steel plate (subject to actual product)
Welding Process: Full penetration welding with reinforced welds at key stress areas
Surface Treatment: Anti-rust treatment
Mounting: Bolted/pinned connection to crawler bogies, hopper, tow arms, etc.
Working Condition: Surface layer paving on various road grades, municipal road construction, pavement maintenance

Applicable Scenarios

The 200637888 frame weldment is suitable for XCMG RP705 medium tracked paver applications including highway surface paving, municipal road construction, pavement maintenance, and industrial/temporary road projects, providing machine load bearing and connection for crawler bogies, hopper, and tow arms.

advantage

OEM structural match: Manufactured to RP705 frame interface dimensions, corresponding to left/right crawler bogie, hopper, and tow arm mounting positions.

Reinforced key areas: Bogie mounting seats, tow arm hinge zones, and hopper support areas use reinforced structures for improved fatigue resistance.

Full penetration welding: Main load-bearing welds use full penetration welding to reduce cracking risk and ensure structural integrity.

Strong load capacity: Meets RP705 machine weight, paving resistance, and travel impact combined load requirements.

Anti-rust treatment: Surface anti-rust treatment suits asphalt heat, dust, and outdoor construction environments.

FAQ 

Q: Which RP705 configurations does the 200637888 frame weldment fit?
A: This part number corresponds to the basic frame structure of the RP705 medium tracked paver, applicable to standard configurations such as RP705IV. Structural differences may exist across years or export configurations; verify with the equipment nameplate or OEM manual.

Q: When does a frame weldment need replacement?
A: Evaluate repair or replacement when weld cracks appear and propagate, overall or local deformation affects crawler bogie positioning, mounting holes wear and enlarge causing loose connections, or critical sections thin from corrosion.

Q: Is decreased paving smoothness always caused by the frame?
A: Not necessarily. Check the screed, leveling system, crawler tension, and tow arm hinge wear first. Inspect the frame for deformation or weld cracking after confirming peripheral components are normal.

Q: Can the frame weldment be partially repaired?
A: Minor weld defects can be repaired by welding per procedure; structural deformation can be corrected. If key stress areas have extensive cracking or severe section thinning, assembly replacement is recommended for load-bearing safety.

Q: What to note during frame weldment installation?
A: Confirm the frame model matches the RP705 configuration. Use suitable lifting equipment to avoid structural deformation during lifting. Tighten crawler bogie and tow arm connections to OEM torque and positioning requirements, ensuring accurate alignment of all mounting points.

our warehouse

our warehouse

Pack and ship

Pack and ship




  • Previous:
  • Next:

  • Write your message here and send it to us