252100864 pipe connector I for XCMG ZL50G/ZL50GL Wheel Loader

Short Description:

The high pressure hose assembly is an important hydraulic pipeline spare part for XCMG ZL50G, ZL50GL wheel loader.

Product Detail

Product Tags

description

This Pipe Connector I 252100864 is specially developed for XCMG ZL50G and ZL50GL wheel loader. It is made of high-quality seamless steel pipe, processed by CNC cutting, deburring, bending and surface anti-rust treatment. The size, bending angle, interface position and aperture all comply with the original OEM drawings. It can be connected with flanges, hose assemblies, valve blocks and oil ports accurately. The inner wall is smooth to reduce fluid resistance and oil turbulence. After strict pressure test, it is not easy to deform and crack under working pressure. It matches the installation space of the original vehicle perfectly, convenient for assembly and replacement, and effectively avoids oil leakage caused by mismatched interfaces.

product parameters

Part Number:252100864
Product Name:Pipe Connector I
Applicable Model:XCMG ZL50G, ZL50GL Wheel Loader
Material:High-quality seamless steel pipe
Surface Treatment:Anti-rust painting / phosphating treatment
Medium:L-HM46 anti-wear hydraulic oil
Working temperature:-20℃ ~ 80℃
Connection method:Flange connection / welding connection
Inspection Items:Dimensional inspection, pressure test, appearance inspection, inner wall cleanliness check

advantage

• Produced in strict accordance with OEM drawing standards, the bending shape and installation hole position are consistent with original parts, direct installation without modification.
• Seamless steel pipe base material, uniform wall thickness, strong pressure resistance, not easy to burst under stable hydraulic pressure.
• Smooth inner wall, small flow resistance, reduce hydraulic system heat generation and energy loss.
• Fine surface anti-rust treatment, slow oxidation and rust speed, adapt to wet and dusty construction environment.
• Stable welding performance, good fit with matching flanges and pipe joints, high sealing reliability after assembly.
• High dimensional consistency of batches, convenient for warehouse stocking and on-site quick replacement.
• Strong vibration resistance, not easy to produce fatigue fracture under long-term machine vibration.

FAQ 

Q: What should I check before installing the steel pipe?
A: Check whether the pipe body has cracks, pits, rust, whether the inner cavity is clean and free of iron filings and debris, and confirm the alignment of the interface.

Q: Why does the steel pipe joint leak oil after installation?
A: It may be the flange surface is not flat, the sealing ring is damaged, the bolt tightening force is uneven, or the pipe deformation causes misalignment.

Q: What should be paid attention to when welding the steel pipe?
A: Control the welding heat input, avoid burning through the pipe wall, and clean welding slag inside and outside after welding to prevent impurities from entering the hydraulic circuit.

Q: What is the difference between hard pipe and high-pressure hose?
A: The steel hard pipe is suitable for fixed layout, good stability; the hose is used for parts with relative movement, which can absorb vibration.

Q: How to maintain the hydraulic steel pipe in daily use?
A: Regularly check for oil seepage, rust and deformation; avoid heavy impact on the pipe body during operation.

our warehouse

our warehouse

Pack and ship

Pack and ship




  • Previous:
  • Next:

  • Write your message here and send it to us