390101239.1 XLZ2103E.05.1.1-10 Earplate Two XCMG XLZ2303E Road Cold Recycling Machine spare parts

Short Description:

390101239.1 Earplate Two is an original special ear plate assembly for XCMG cold recyclers, mainly used for hinged connection, traction and load transfer of key working mechanisms and structural parts.


Product Detail

Product Tags

description

Part number:390101239.1
Part name:XLZ2103E.05.1.1-10 Earplate Two
Unit name:390101239 XLZ2103E.05.1.1-10 Earplate 2
Applicable Models: Suitable for XCMG cold recycler XLZ2303E. It is mainly installed at the connection positions of working devices, frame and executing mechanism, bearing long-term alternating load, impact and vibration under heavy-duty road construction conditions.

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Factory drawing number/Part Name/Remark

390101239.1 XLZ2103E.05.1.1-10 Earplate Two
820100073 Hot-rolled thick steel plate, T25, Q345

====================================================

advantages

  • Forged from high-strength alloy steel with high tensile strength, fatigue resistance and not easy to crack.
  • Precision machining ensures accurate hole position and good concentricity, ensuring stable matching with shaft pins.
  • Reasonable stress structure design, effectively disperses load and improves overall connection reliability.
  • Surface anti-corrosion treatment, strong weather resistance, suitable for long-term outdoor heavy-duty operation.
  • Original factory size with good interchangeability, direct replacement without modification.

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

maintenance & replacement tips

  • Regularly check for cracks, deformation, hole wear and loose connection.
  • Keep the surface clean to avoid rust caused by mud and water accumulation.
  • Replace with original earplate to ensure matching accuracy and structural safety.
  • Tighten the connecting pin shaft according to specified torque during installation.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us