801900007 6-QAW-180D Battery XCMG XGC55K.00 Crawler Crane spare parts
description
Part number:801900007
Part name: 6-QAW-180D Battery
Unit name: XCMG XGC55K.00 Crawler Crane
Applicable Models: XCMG XGC55K.00 Crawler Crane
*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.
Item No./Factory drawing number/Part Name/Remark
800352997 BOWEX 80-11.5 (5950480) coupling for XGC55K Shangchai engine
800353000 QBL260A6 Winch Gearbox (ZFT26W51-22)
800362325 EN818-2, Chain L=1520, D=16, P=48
800500282 GB/T283-1994 Bearing NJ1026
800500430 Bearing GB/T 283-1994 NJ216E
801100343 JB/T7940.1-1995 Oil cup M10×1 (with protective cap)
801100559 2-225 O-ring 47.22×3.53 Imported
801100618 2-219 O-ring 32.92×3.53 Imported
801103185 QUQ1-20×0.4 Air Filter
801336384 GB/T5973-2006 Wedge Sleeve 20
801336388 GB/T5973-2006 wedge 20
801500365 Hammer head 8P (with nylon handle)
801504170 Right pilot control valve (crawler crane)
801504171 Left pilot control valve (crawler crane)
801900007 6-QAW-180D Battery
801900028 Cable ties 4.8×200
801900037 9×530 Cable ties
801900040 2.5×100 Cable ties
801900044 2 Hose clamps φ38-φ57
801900051 2X Hose Clamps φ44-φ64
====================================================
advantages
1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service
packing
1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements
logistics and transportation
We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.
warehouse
We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.
our warehouse

Pack and ship

- Aerial Boom Lift
- China Dump Truck
- Cold Recycler
- Cone Crusher Liner
- Container Side Lifter
- Dadi Bulldozer Part
- Forklift Sweeper Attachment
- Hbxg Bulldozer Parts
- Howo Engine Parts
- Hyundai Excavator Hydraulic Pump
- Komatsu Bulldozer Parts
- Komatsu Excavator Gear Shaft
- Komatsu Pc300-7 Excavator Hydraulic Pump
- Liugong Bulldozer Parts
- Sany Concrete Pump Spare Parts
- Sany Excavator Spare Parts
- Shacman Engine Parts
- Shantui Bulldozer Clutch Shaft
- Shantui Bulldozer Connecting Shaft Pin
- Shantui Bulldozer Control Flexible Shaft
- Shantui Bulldozer Flexible Shaft
- Shantui Bulldozer Lifting Cylinder Repair Kit
- Shantui Bulldozer Parts
- Shantui Bulldozer Reel Shaft
- Shantui Bulldozer Reverse Gear Shaft
- Shantui Bulldozer Spare Parts
- Shantui Bulldozer Winch Drive Shaft
- Shantui Dozer Bolt
- Shantui Dozer Front Idler
- Shantui Dozer Tilt Cylinder Repair Kit
- Shantui Sd16 Bevel Gear
- Shantui Sd16 Brake Lining
- Shantui Sd16 Door Assembly
- Shantui Sd16 O-Ring
- Shantui Sd16 Track Roller
- Shantui Sd22 Bearing Sleeve
- Shantui Sd22 Friction Disc
- Shantui Sd32 Track Roller
- Sinotruk Engine Parts
- Tow Truck
- Xcmg Bulldozer Parts
- Xcmg Bulldozer Spare Parts
- Xcmg Hydraulic Lock
- Xcmg Transmission
- Yuchai Engine Parts






