839900213 Sealing tape XCMG QUY55E.00 Crawler Crane spare parts
description
Part number:839900213
Part name:Sealing tape
Unit name: XCMG QUY55E.00 Crawler Crane
Applicable Models: XCMG QUY55E.00 Crawler Crane
*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.
Item No./Factory drawing number/Part Name/Remark
822500039 Gear Oil L-CKD220-320
822500099 No. 0 Extreme Pressure Lithium-Based Grease
822500106 Lithium-based grease #3
822500115 Lithium-based grease NLGL2
822502821 Lithium-based grease #2
822533572 AE46 Anti-wear Hydraulic Oil
822700003 Topcoat Hardener C-60
822700007 Two-component polyurethane XCMG yellow topcoat UL800H
822700010 Two-component polyurethane intermediate coating gray UL800H
822700254 Two-component polyurethane dark gray topcoat UL800H
822700259 Primer Hardener BA-01
822735084 Two-component epoxy gray-white primer EP101
822900001 Diluent NO:7600
822900002 Intermediate Coating Hardener D-50
822900010 FD-1 type (-25) multi-effect engine coolant
822900025 Diluent NO:1000
839900081 Double Lion brand tape
839900102 Plastic sleeve φ8
839900213 Sealing tape
839968293 Small rain silk dust bag 120×210
====================================================
advantages
1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service
packing
1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements
logistics and transportation
We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.
warehouse
We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.
our warehouse

Pack and ship

- Aerial Boom Lift
- China Dump Truck
- Cold Recycler
- Cone Crusher Liner
- Container Side Lifter
- Dadi Bulldozer Part
- Forklift Sweeper Attachment
- Hbxg Bulldozer Parts
- Howo Engine Parts
- Hyundai Excavator Hydraulic Pump
- Komatsu Bulldozer Parts
- Komatsu Excavator Gear Shaft
- Komatsu Pc300-7 Excavator Hydraulic Pump
- Liugong Bulldozer Parts
- Sany Concrete Pump Spare Parts
- Sany Excavator Spare Parts
- Shacman Engine Parts
- Shantui Bulldozer Clutch Shaft
- Shantui Bulldozer Connecting Shaft Pin
- Shantui Bulldozer Control Flexible Shaft
- Shantui Bulldozer Flexible Shaft
- Shantui Bulldozer Lifting Cylinder Repair Kit
- Shantui Bulldozer Parts
- Shantui Bulldozer Reel Shaft
- Shantui Bulldozer Reverse Gear Shaft
- Shantui Bulldozer Spare Parts
- Shantui Bulldozer Winch Drive Shaft
- Shantui Dozer Bolt
- Shantui Dozer Front Idler
- Shantui Dozer Tilt Cylinder Repair Kit
- Shantui Sd16 Bevel Gear
- Shantui Sd16 Brake Lining
- Shantui Sd16 Door Assembly
- Shantui Sd16 O-Ring
- Shantui Sd16 Track Roller
- Shantui Sd22 Bearing Sleeve
- Shantui Sd22 Friction Disc
- Shantui Sd32 Track Roller
- Sinotruk Engine Parts
- Tow Truck
- Xcmg Bulldozer Parts
- Xcmg Bulldozer Spare Parts
- Xcmg Hydraulic Lock
- Xcmg Transmission
- Yuchai Engine Parts







