860134821 Straight-through injection cup XCMG XE370D hydraulic excavator spare parts

Short Description:

Product advantages:

1. High -quality products.
2. Select high -quality materials.
3. More accurate matching size.
4. Reduce the risk of damage.
5. Factory sells directly, price discounts.
6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number:860134821
Part name:Straight-through injection cup
Unit name:803083882 Left boom cylinder (L)
Applicable Models: XCMG XE370D hydraulic excavator

====================================

ITEM /PART NO. /PART NAME

1 860119674 Piston rod
2 860119675 End Cap
3 860119676 Cylinder Block
4 860139831 Buffer sleeve
5 860119677 Piston
6 860139957 Nut
7 860126852 Gasket
8 860139958 Left boom hose assembly A
9 860139959 Left boom tubing assembly B
10 860119680 Clamp assembly
11 860136847 Pressure Plate
12 860134821 Straight-through injection cup
13 860139823 Dustproof ring
14 860128206 Dustproof ring/shield
15 860126856 Rod sealing ring
16 860139842 Open-end retaining ring
17 860139826 Buffer ring
18 860134816 Socket head cap screw
19 860126858 Sliding bushing
20 860126859 Wire retaining ring for holes
21 860126860 O-ring
22 860139960 O-ring retainer
23 860139961 Buffer ring
24 860139962 Guide ring
25 860129264 Hole sealing ring
26 860128148 Pollution Control Ring
27 860134819 Socket headstock set screw
28 860136859 Steel ball
29 860136860 Dust ring
30 860136880 Dustproof Ring
31 860134823 Socket head cap screw
32 860126915 O-ring
33 860134824 Hex head bolts
34 860136861 Spring Washer
35 860136863 Spring Washer
36 860136862 Hex head bolt
37 860128225 Rubber gasket
38 860128224 Oil port gasket
39 860136864 Socket head cap screw
40 860202490 Pressure test plug
41 803270266 C-type bushing
42 860126867 Graphite copper sleeve

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us