940000981 COMPRESSOR XCMG D260 Crawler Bulldozer spare parts

Short Description:

Fit for XCMG bulldozer D260, suitable for earth pushing, site leveling and mine stripping. Used to replace original compressor with insufficient air supply, abnormal noise, oil leakage and internal damage.


Product Detail

Product Tags

description

Part number:940000981
Part name:COMPRESSOR
Unit name:940002844 AC SYSTEM
Applicable Models: XCMG D260 Crawler Bulldozer

COMPRESSOR is the core component of bulldozer air system. Driven by engine, it compresses air and supplies pressurized air for brake system and air‑control parts to ensure normal operation of machine brake and air‑valve mechanism. Worn internal piston, damaged valve plate and failed bearing will result in insufficient air supply, low exhaust pressure, abnormal noise and oil leakage, directly lead to insufficient brake air source and bring operation safety risk.

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Factory drawing number/Part Name/Remark

1 940000981 1 COMPRESSOR
2 940000980 1 COLD-STEAM LINE
3 940000988 1 PRESSURE-COLD LINE
4 940000986 1 PRESSURE-STEAM LINE
5 940004388 1 T2101-6500PIPE
6 940004387 1 Air Conditioner Internal Circulation Filter
7 940002846 1 EVAPORATOR ASSEMBLY
8 940000985 1 CONDENSER

====================================================

advantages

  • Mounting support, drive connection and air port specifications match original parts, good interchangeability for direct installation without pipeline and drive‑mechanism modification.
  • Internal precision components pass durability test, withstand heavy‑load impact and continuous vibration of bulldozer with stable air‑pressure output.
  • Excellent sealing performance reduces oil carry‑over and lowers oil contamination risk for air system.
  • Supplied as complete unit, less parts assembly work, easy disassembly, suitable for overseas project spare‑parts stocking.

FAQ

Q: Can compressor with slight oil carry‑over keep working?
A: Oil carry‑over will get worse gradually and contaminate brake air circuit, timely replacement is recommended.
Q: Why air pressure cannot build‑up after new compressor installation?
A: Check pipeline air leakage, troubleshoot drive slipping and verify condition of air tank and safety valve.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us