A229900000564 Cortrol plate SANY PY190A Motor Grader spare parts

Short Description:

Product advantages:

1. High -quality products. 2. Select high -quality materials. 3. More accurate matching size. 4. Reduce the risk of damage. 5. Factory sells directly, price discounts. 6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number:A229900000564
Part name:Cortrol plate
Unit name:A810505000071 Air conditioning system
Applicable Models: SANY PY190A Motor Grader

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Code/Factory drawing number/Part Name

1 A221600000039 KGP-3102F Air-condition
a A229900001661 KGP3102F-00 Evaporator assembly
b A230103000781 L2000-90-90 D-E tube
c A230103000783 L800-45-90 C-C tube
d A230103000784 L2000-45-90 E-C tube
e A230103000782 L300-0-90 C-D tube
f A229900000560 917型 Deposited liquid set
g A229900001641 3115C2-1 Deposited liquid set Card
h A229900001679 L3117 Condensator assembly
i B230106000020 13-1180 A triangle strap
j A229900001641 ET-209L Compressor
k A229900000563 φ80×800 Ripple-pipe aeration route
l A229900000572 F123×49 Aeration window
m A229900000564 Cortrol plate
n A229900000566 O-ring
o A239900000173 δ3 Foam glue
2 A210891000005 Larynx fixation42.025
3 A210741000003 d=16L=3.2m GB7548-87 Rubber hose
4 A210741000002 d=16L=2.8m GB7548-87 Rubber hose
5 A820205000749 PQ160.18-2 Connecter

====================================================

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us