China New Product Shantui Sd22 Flat Gasket - Track Assemly for bulldozer spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our goal is usually to deliver high quality items at aggressive price ranges, and top-notch service to shoppers around the entire world. We're ISO9001, CE, and GS certified and strictly adhere to their high quality specifications for Dongfeng Cummins Engine Parts, Jiangling Motors Parts, Komatsu Excavator Swivel Joint, Our Company Core Principle: The prestige first ;The quality guarantee ;The customer are supreme.
China New Product Shantui Sd22 Flat Gasket - Track Assemly for bulldozer spare parts – CCMIC Detail:

Track Assemly

 

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing

Carton Boxes, or according to clients’ request.

description

Crawler disassembly problem
Crawler bulldozer half shafts are usually pressed in with a force of more than 400kN and pulled out with proprietary equipment. In factories without special equipment, methods such as jacking out or oxygen blowing and boring with a boring machine are used. The process is complicated, the success rate is low, and the labor intensity is high. We have summarized a simple and easy way to disassemble and assemble. When disassembling, first remove all the parts of the side reduction gear, and then use the waste roller shell 2 without inner bearing sleeve to cover the half shaft 1, and tie a rope about 2m in length to the roller shell. Sleeve a backing plate 3 at the end of the half shaft, tighten the fixing nut 4 at the end, and the torque is not less than 0.3k?N. The two people use the rope to pull the roller shell 2 to hit the backing plate 3, thereby pulling out the half shaft 1. When assembling, tighten it on the outer end of the half shaft 1, and tighten the lock nut on the inner side of the half shaft while hitting the nut with a weight to smoothly install.

The track of the bulldozer wears quickly. After 4 500 hours of operation, the track shoe rack (referred to as the grouser, the same below) and the track pin sleeve (referred to as the pin sleeve, the same below) have reached the maintenance limit (see Table 1 and Figure 1) , It must be repaired, otherwise the work efficiency and economic benefits will be significantly reduced, and the entire assembly will be scrapped due to no repair value after severe wear. According to the wear of the track, the chain links can still be used, but the pin sleeve and grouser must be repaired. Wrap 1 standard maintenance measured code item R inch limit size nntn) fInm1 (mm) h grouser height 93.0 30 0 25 0 D village sleeve outer diameter 98 5 92.5 91 6 H chain link height 18l 0 163.0 1740 1 The pin sleeve is repaired by rotating the pin sleeve 180. After continuing to use the method. Because the track of this model is lubricated, in the process of repairing the sleeve, according to the wear of the inner diameter of the pin sleeve and the outer diameter of the pin ring 1, 1999 (11) Liu Yunchao, Zhao Hongtao, and the outer diameter,

The following can be performed:
(1) Wear Smaller ones with guaranteed sealing performance are still assembled as a lubricating type.
(2) If the abrasion is large and the sealing performance is reduced, the oil may leak. Consider changing to a grease-filled type (that is, apply lithium-based grease on the surface of the pin shaft and the inner surface of the pin sleeve before assembling).

our warehouse

our warehouse

Pack and ship

Pack and ship

Product detail pictures:

China New Product   Shantui Sd22 Flat Gasket  - Track Assemly for bulldozer spare parts – CCMIC detail pictures

China New Product   Shantui Sd22 Flat Gasket  - Track Assemly for bulldozer spare parts – CCMIC detail pictures


Related Product Guide:

To be able to ideal satisfy client's requirements, all of our operations are strictly performed in line with our motto "High High-quality, Competitive Price tag, Fast Service" for China New Product Shantui Sd22 Flat Gasket - Track Assemly for bulldozer spare parts – CCMIC , The product will supply to all over the world, such as: Seattle, Mecca, Cape Town, We're your reliable partner in the international markets of our products and solutions. We focus on providing service for our clients as a key element in strengthening our long-term relationships. The continual availability of high grade solutions in combination with our excellent pre- and after-sales service ensures strong competitiveness in an increasingly globalized market. We're willing to cooperate with business friends from at home and abroad, to create a great future. Welcome to Visit our factory. Looking forward to have win-win cooperation with you.
The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
5 Stars By Wendy from Israel - 2017.09.29 11:19
Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
5 Stars By Hellyngton Sato from Florence - 2017.03.28 16:34
Write your message here and send it to us