Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We follow our enterprise spirit of "Quality, Efficiency, Innovation and Integrity". We aim to create much more worth for our buyers with our abundant resources, highly developed machinery, experienced workers and great providers for Komatsu Excavator Floating Seal Assy, Komatsu D20a Parts, Shantui Valve, We will wholeheartedly welcome all clients in the industry both at home and abroad to cooperate hand in hand, and create a bright future together.
Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC Detail:

discharge port

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

How to correctly judge if the discharge port is blocked

In the normal construction process, if the discharge port is suddenly blocked, it can be judged by the following phenomena: The concrete feeding of the concrete pump stops running and is accompanied by obvious sound changes and violent vibrations. At this time, the concrete pump is conveying There is no vibration in the pipeline. If the staff finds the above phenomenon, then they can draw a definite conclusion: the discharge port is blocked.

How to deal with the discharge port being blocked by concrete

Once the concrete pump is blocked, the operator can immediately take the following measures to restore the pump to its normal state: quickly fill the hopper with cement slurry, then jog to control the reverse operation of the concrete pump, and then electrically control the forward operation of the concrete pump. Repeat several times until the pipeline is unblocked. If the pipeline is still not unblocked at this time, the worker can disassemble the outlet connecting pipe, remove the debris that blocks the pipeline, restore the pipeline, and finally start the concrete pump.

When the staff inspects the pump in operation, they can check the size of the load by looking at the motor current of the concrete pump. As the load of the concrete pump increases, the motor current will increase. As the load decreases, the motor current will decrease. The change of the motor current is a true reflection of the load change of the concrete pump, and it is very simple and effective to check.

our warehouse

our warehouse

Pack and ship

Pack and ship

Product detail pictures:

Factory Cheap Hot  Solar 55 Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures

Factory Cheap Hot  Solar 55 Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures


Related Product Guide:

Our company promises all buyers of the first-class products and solutions as well as most satisfying post-sale support. We warmly welcome our regular and new shoppers to join us for Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC , The product will supply to all over the world, such as: Rotterdam, Suriname, Macedonia, Now we have a dedicated and aggressive sales team, and many branches, catering to our main customers. We have been looking for long-term business partnerships, and ensure our suppliers that they will undoubtedly benefit in both short and long run.
The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
5 Stars By Adam from Cancun - 2017.12.09 14:01
The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
5 Stars By Hilary from Portland - 2017.12.19 11:10
Write your message here and send it to us