High Quality for Shantui Bulldozer Retaining Ring - Track Assemly for bulldozer spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We will devote ourselves to providing our esteemed customers with the most enthusiastically thoughtful services for Xcmg Wheel Loader Spare Parts, Xcmg Concrete Pump Parts, Cat 320c Excavator Plunger Pump, For further queries or should you have any question regarding our products, please do not hesitate to contact us.
High Quality for Shantui Bulldozer Retaining Ring - Track Assemly for bulldozer spare parts – CCMIC Detail:

Track Assemly

 

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing

Carton Boxes, or according to clients’ request.

description

Crawler disassembly problem
Crawler bulldozer half shafts are usually pressed in with a force of more than 400kN and pulled out with proprietary equipment. In factories without special equipment, methods such as jacking out or oxygen blowing and boring with a boring machine are used. The process is complicated, the success rate is low, and the labor intensity is high. We have summarized a simple and easy way to disassemble and assemble. When disassembling, first remove all the parts of the side reduction gear, and then use the waste roller shell 2 without inner bearing sleeve to cover the half shaft 1, and tie a rope about 2m in length to the roller shell. Sleeve a backing plate 3 at the end of the half shaft, tighten the fixing nut 4 at the end, and the torque is not less than 0.3k?N. The two people use the rope to pull the roller shell 2 to hit the backing plate 3, thereby pulling out the half shaft 1. When assembling, tighten it on the outer end of the half shaft 1, and tighten the lock nut on the inner side of the half shaft while hitting the nut with a weight to smoothly install.

The track of the bulldozer wears quickly. After 4 500 hours of operation, the track shoe rack (referred to as the grouser, the same below) and the track pin sleeve (referred to as the pin sleeve, the same below) have reached the maintenance limit (see Table 1 and Figure 1) , It must be repaired, otherwise the work efficiency and economic benefits will be significantly reduced, and the entire assembly will be scrapped due to no repair value after severe wear. According to the wear of the track, the chain links can still be used, but the pin sleeve and grouser must be repaired. Wrap 1 standard maintenance measured code item R inch limit size nntn) fInm1 (mm) h grouser height 93.0 30 0 25 0 D village sleeve outer diameter 98 5 92.5 91 6 H chain link height 18l 0 163.0 1740 1 The pin sleeve is repaired by rotating the pin sleeve 180. After continuing to use the method. Because the track of this model is lubricated, in the process of repairing the sleeve, according to the wear of the inner diameter of the pin sleeve and the outer diameter of the pin ring 1, 1999 (11) Liu Yunchao, Zhao Hongtao, and the outer diameter,

The following can be performed:
(1) Wear Smaller ones with guaranteed sealing performance are still assembled as a lubricating type.
(2) If the abrasion is large and the sealing performance is reduced, the oil may leak. Consider changing to a grease-filled type (that is, apply lithium-based grease on the surface of the pin shaft and the inner surface of the pin sleeve before assembling).

our warehouse

our warehouse

Pack and ship

Pack and ship

Product detail pictures:

High Quality for  Shantui Bulldozer Retaining Ring  - Track Assemly for bulldozer spare parts – CCMIC detail pictures

High Quality for  Shantui Bulldozer Retaining Ring  - Track Assemly for bulldozer spare parts – CCMIC detail pictures


Related Product Guide:

Our products are widely recognized and trusted by users and can meet continuously developing economic and social needs for High Quality for Shantui Bulldozer Retaining Ring - Track Assemly for bulldozer spare parts – CCMIC , The product will supply to all over the world, such as: Greek, Estonia, Mongolia, We have top engineers in these industries and an efficient team in the research. What is more, we have our own archives mouths and markets in China at low cost. Therefore, we can meet different inquiries from different clients. Please find our website to check more information from our products.
This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
5 Stars By Sara from Bulgaria - 2018.07.12 12:19
The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
5 Stars By Jean from Hungary - 2018.09.23 18:44
Write your message here and send it to us