S2502.0B Check valve Changlin CG958G wheel loader spare parts

Short Description:

Product advantages:

1. High -quality products.
2. Select high -quality materials.
3. More accurate matching size.
4. Reduce the risk of damage.
5. Factory sells directly, price discounts.
6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number:S2502.0B
Part name:Check valve
Unit name:Z50G08T7 Steering System
Applicable Models: Changlin CG958G wheel loader

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Factory drawing number/Part Name/Remark

1 φ84X270 Oil suction hose
2 φ80~φ100 Steel wire clamp
3 Z50G0801T7 Oil suction pipe assembly
4 T6DCM-B24-B05-3R23-C1 Steering pump
5 FL-20 (d12) Flange
6 1DFL9-36-20FA Flange connector
7 2HD-42-36 Connector
8 S2502.0B Check valve
9 1DM-36-42WD Connector
10 2D9-36 elbow joint
11 20512-36-16TX4SP16TKAGX580 Hose assembly
12 Z50G0802T7 Priority transfer valve assembly
13 Z50G0803T7 Emergency steering powertrain
14 20441-30-12/20491-30-12X1T12GTX840V90° Hose assembly
15 20411-22-12X2T12GTX650 Hose 1
16 20411-30-12/20491-30-12X2T12GTX1050 Hose assembly
17 20411-14-04/20491-14-04X1T04GTX1170 Hose assembly

==========================

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us