SP185845 Roller Liugong CLGB320C bulldozer spare parts
description
Part number: SP185845
Part name: Roller
Unit name: 43C1127 Carrier roller
Applicable Models: Liugong CLGB320C crawler bulldozer
Compatible with LiuGong Bulldozer CLGB320C. Suitable for heavy‑duty continuous operation including mine stripping, earth‑rock pushing, site leveling and subgrade construction. Applied for roller oil leakage, worn & chipped wheel surface, jammed rotation with abnormal noise and undercarriage overhaul maintenance. Fit for original spare‑part replacement, overseas project maintenance in Middle East and Southeast Asia, travel‑undercarriage service for CLGB320C bulldozer.
ITEM/PART NO./PART NAME
1 SP225726 SUPPORT 4
2 06B0021 WASHER 2 20
3 01B0502 BOLT 2 M20×90-10.9-DK (Change to 01B0502)
4 SP185845 CARRIER ROLLER 4
=======================================
advantages
- The wheel body adopts wear‑resistant alloy steel with quenching treatment, resisting sand‑stone cutting wear for harsh mine working conditions
- Matched high‑quality floating oil seal delivers reliable sealing performance, effectively prevents sediment intrusion and reduces oil‑leakage failure
- Shaft diameter, wheel width and fitting dimension fully match OEM part for direct interchange without modifying undercarriage bracket
- Internal bearing assembly features high load‑capacity to bear heavy impact load of bulldozer and extend service life.
FAQ
Q: Is full‑roller replacement required for slight oil seepage and minor wheel wear?
A: Repair sealing parts if wheel body is intact. Replace whole roller assembly once crack, heavy chipping or continuous oil leakage occurs.
Q: What should be checked firstly if travelling abnormal noise remains after new‑roller installation?
A: Inspect abnormal track tension, worn carrier roller and worn track link first, check roller itself after troubleshooting peripheral components.
warehouse
We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.
our warehouse

Pack and ship

- Aerial Boom Lift
- China Dump Truck
- Cold Recycler
- Cone Crusher Liner
- Container Side Lifter
- Dadi Bulldozer Part
- Forklift Sweeper Attachment
- Hbxg Bulldozer Parts
- Howo Engine Parts
- Hyundai Excavator Hydraulic Pump
- Komatsu Bulldozer Parts
- Komatsu Excavator Gear Shaft
- Komatsu Pc300-7 Excavator Hydraulic Pump
- Liugong Bulldozer Parts
- Sany Concrete Pump Spare Parts
- Sany Excavator Spare Parts
- Shacman Engine Parts
- Shantui Bulldozer Clutch Shaft
- Shantui Bulldozer Connecting Shaft Pin
- Shantui Bulldozer Control Flexible Shaft
- Shantui Bulldozer Flexible Shaft
- Shantui Bulldozer Lifting Cylinder Repair Kit
- Shantui Bulldozer Parts
- Shantui Bulldozer Reel Shaft
- Shantui Bulldozer Reverse Gear Shaft
- Shantui Bulldozer Spare Parts
- Shantui Bulldozer Winch Drive Shaft
- Shantui Dozer Bolt
- Shantui Dozer Front Idler
- Shantui Dozer Tilt Cylinder Repair Kit
- Shantui Sd16 Bevel Gear
- Shantui Sd16 Brake Lining
- Shantui Sd16 Door Assembly
- Shantui Sd16 O-Ring
- Shantui Sd16 Track Roller
- Shantui Sd22 Bearing Sleeve
- Shantui Sd22 Friction Disc
- Shantui Sd32 Track Roller
- Sinotruk Engine Parts
- Tow Truck
- Xcmg Bulldozer Parts
- Xcmg Bulldozer Spare Parts
- Xcmg Hydraulic Lock
- Xcmg Transmission
- Yuchai Engine Parts







