SP226883 sealed packet Liugong CLGB320C bulldozer spare parts

Short Description:

SP226883 Sealed Packet is a professional full-set sealing maintenance accessory exclusively matched for Liugong CLGB320C bulldozer, specially designed for the machine’s transmission and travel hydraulic sealing system. Adopting low-temperature resistant, anti-deformation and oil-immersion durable materials, this sealing kit features excellent static and dynamic sealing performance. It effectively seals the assembly gaps of travel gearboxes, transmission pipelines and matching joints, prevents hydraulic pressure loss and external sediment infiltration, stabilizes the power transmission output of the bulldozer, and adapts to long-distance walking and frequent alternating load construction conditions.

Product Detail

Product Tags

description

Part number: SP226883
Part name: sealed packet
Unit name: 11C0654P04 GEAR SHIFT PUMP
Applicable Models: Liugong CLGB320C crawler bulldozer

ITEM/PART NO./PART NAME

16 SP226883 SEALED PACKET

=======================================

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

FAQ

1. What is the core function of SP226883 sealed packet?
The SP226883 complete sealing kit focuses on the sealing protection of bulldozer transmission and travel system. It blocks oil leakage and air leakage at each connecting gap, maintains tight internal sealing of the travel hydraulic system, ensures stable power transmission and consistent walking speed, and avoids power attenuation and sliding speed deviation during equipment operation.
2. What performance advantages does SP226883 sealed packet have?
This sealing packet is optimized for the continuous walking vibration and alternating load characteristics of bulldozers. It boasts outstanding low-temperature toughness and oil corrosion resistance, not easy to harden and shrink in harsh environments. The overall matching precision is high, with good compression reset performance, which can maintain long-term stable sealing effect for transmission and travel parts.
3. Can SP226883 sealed packet be installed directly without modification?
Yes. All sealing rings, gaskets and oil seals in the kit fully conform to the original factory assembly standards of CLGB320C bulldozer transmission and travel system. The dimensions and installation tolerances are accurately matched, supporting one-piece replacement installation without cutting or secondary adjustment.
4. What problems will be caused by damaged or aging SP226883 sealed parts?
Aging and failure of transmission system seals will lead to hidden leakage of travel hydraulic pressure, resulting in insufficient walking power, uneven traveling speed, idle sliding and other failures. It will cause unstable equipment driving state and seriously affect the straight-line traveling accuracy and construction consistency of the bulldozer.
5. When should the SP226883 sealed packet be replaced?
It is suitable for regular maintenance and transmission system overhaul of CLGB320C bulldozer. Replacement is required when the equipment has unstable walking power, idle sliding, slight oil leakage at transmission joints, or aging and shrinkage of original sealing parts after seasonal operation.
6. How does this SP226883 sealed packet improve construction stability?
It effectively solves the problem of pressure loss and oil leakage in the transmission travel system, ensures stable power transmission and uniform walking speed, avoids walking jitter and offset caused by poor sealing, and greatly improves the driving stability and straight-line operation precision of the bulldozer.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us