Wholesale Price Komatsu Pc200-8 Plunger Pump - discharge port for concrete pump spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Dedicated to strict high-quality management and considerate purchaser support, our experienced employees members are usually available to discuss your specifications and be certain full shopper satisfaction for Fujitsu Hydraulic Pump, Xcmg Excavator Hydraulic Pump, Shantui Dozer Track Chain, We have experienced manufacturing facilities with more than 100 employees. So we can guarantee short lead time and quality assurance.
Wholesale Price Komatsu Pc200-8 Plunger Pump - discharge port for concrete pump spare parts – CCMIC Detail:

discharge port

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

How to correctly judge if the discharge port is blocked

In the normal construction process, if the discharge port is suddenly blocked, it can be judged by the following phenomena: The concrete feeding of the concrete pump stops running and is accompanied by obvious sound changes and violent vibrations. At this time, the concrete pump is conveying There is no vibration in the pipeline. If the staff finds the above phenomenon, then they can draw a definite conclusion: the discharge port is blocked.

How to deal with the discharge port being blocked by concrete

Once the concrete pump is blocked, the operator can immediately take the following measures to restore the pump to its normal state: quickly fill the hopper with cement slurry, then jog to control the reverse operation of the concrete pump, and then electrically control the forward operation of the concrete pump. Repeat several times until the pipeline is unblocked. If the pipeline is still not unblocked at this time, the worker can disassemble the outlet connecting pipe, remove the debris that blocks the pipeline, restore the pipeline, and finally start the concrete pump.

When the staff inspects the pump in operation, they can check the size of the load by looking at the motor current of the concrete pump. As the load of the concrete pump increases, the motor current will increase. As the load decreases, the motor current will decrease. The change of the motor current is a true reflection of the load change of the concrete pump, and it is very simple and effective to check.

our warehouse

our warehouse

Pack and ship

Pack and ship

Product detail pictures:

Wholesale Price  Komatsu Pc200-8 Plunger Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures

Wholesale Price  Komatsu Pc200-8 Plunger Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures


Related Product Guide:

We have now sophisticated machines. Our solutions are exported to the USA, the UK and so on, enjoying a great reputation amid consumers for Wholesale Price Komatsu Pc200-8 Plunger Pump - discharge port for concrete pump spare parts – CCMIC , The product will supply to all over the world, such as: Dominica, Surabaya, Brunei, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.
We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
5 Stars By Doris from Portugal - 2018.07.26 16:51
It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
5 Stars By Page from Johor - 2017.09.29 11:19
Write your message here and send it to us