XB00001052 Temperature sensor HITACHI 490LCH-5A Hydraulic Excavator spare parts

Short Description:

Product advantages:

1. High -quality products. 2. Select high -quality materials. 3. More accurate matching size. 4. Reduce the risk of damage. 5. Factory sells directly, price discounts. 6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number:XB00001052
Part name:Temperature sensor
Unit name:Air conditioning components
Applicable Models: HITACHI 490LCH-5A Hydraulic Excavator

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Factory drawing number/Part Name/Remark

YA00016428 air conditioning components
01 YA00024500 * Housing
02 YA00024501 * Board
03 YA00024502 ​​* Evaporator
04 XB00001045 * Valve
05 YA00024503 * Pad
06 YA00024504 * Sheath
07 XB00001048 * Bolt
08 XB00001049 * Bolt
09 YA00024505 * Pad
10 YA00024506 * Heater core
11 XB00001052 * Temperature sensor
12 XB00001053 * Pipe clamp
13 XB00001054 * Board
14 XB00001055 * Board
15 XB00001056 * Motor
16 XB00001057 * Motor
17 XB00001058 * Transistor
18 XB00001059 * Motor
19 XB00001060 * shaft
15 XB00001056 * Motor
16 XB00001057 * Motor
17 XB00001058 * Transistor
18 XB00001059 * Motor
19 XB00001060 * shaft
25 XB00001065 * Self-tapping screw
26 YA00024508 * Self-tapping screw
29 XB00001068 * Screw plug
34 XB00001073 * Joystick
37 YA00024509 * Housing
38 XB00001077 * Joystick
39 XB00001078 * Door
40 YA00024510 * Pad
41 YA00024511 * Housing
42 YA00024512 * Housing

====================================================

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us