Z50B.21-3 Evaporator pad Changlin ZLM40E wheel loader spare parts

Short Description:

Product advantages:

1. High -quality products.
2. Select high -quality materials.
3. More accurate matching size.
4. Reduce the risk of damage.
5. Factory sells directly, price discounts.
6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number:Z50B.21-3
Part name:Evaporator pad
Unit name:Z40E.21 Air conditioning system
Applicable Models: Changlin ZLM40E wheel loader

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Factory drawing number/Part Name/Remark

1 7/8-14UNF 1/2 low pressure hose L=2600
2 6/8-16UNF 13/32 High pressure hose L=2600
3 Q/CHL02.002-1999 Nylon Hoop 90
4 Z50B.21-3 Evaporator pad
5 GB/T5783-1986 Bolt M6×16ZnD
6 GB/T93-1987 Washer 6
7 GB/T97.2-1985 Washer 6ZnD
8 GQL2B-001 Condenser
9 5/8-16UNF 5/16 High pressure hose L=1750
10 5/8-16UNF 5/16 low pressure hose L=1700
11 GB/T5783-1986 Bolt M12×30ZnD
12 GB/T93-1987 Washer 12
13 GB/T97.2-1985 Washer 12ZnD
14 GQT7 Reservoir
15 GB/T5783-1986 Bolt M6×12ZnD
16 GQT7-052 Reservoir Card
17 GQZ14A-001 Evaporator
18 Q/CHL02.003-1999 coil 36
19 JB/T8870-1999 throat clamp d25
20 Z40E.21-1 Water outlet pipe Ф16-1600

==========================

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us