ZB2BS64+BZ102 Parking brake button Changlin CG958G wheel loader spare parts

Short Description:

Product advantages:

1. High -quality products.
2. Select high -quality materials.
3. More accurate matching size.
4. Reduce the risk of damage.
5. Factory sells directly, price discounts.
6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number: ZB2BS64+BZ102
Part name:Parking brake button
Unit name:ZL50G (T7) Electrical Equipment Distribution
Applicable Models: Changlin CG958G wheel loader

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Item No./Factory drawing number/Part Name/Remark

67 DW-2/ZF200 Gear Selector
68 ZF200 Shift solenoid valve assembly
69 5A controller fuse
70 PS61-50/ 35bar Service brake cut-off switch
71 PS61-50/ 69bar Parking brake pressure switch
72 JQ201S-PLO Emergency warning light relay
73 JK981-000-4.66/4.67 Power cut-off selector switch
74 ZB2BS64+BZ102 Parking brake button
75 JQ201S-PLO Power cut-off relay
76 PS61-30/ 69bar Low pressure parking brake switch
77 GSO23300 Parking brake solenoid valve
78 PS61-50/ 103bar Brake low pressure alarm switch
79 CY-Ⅱ/0.35Mpa Hydraulic oil return blockage alarm switch
80 JK981-000- Diagnostic switch
81 JK981-066- Faulty page switch
82 WM526 Electronic throttle assembly
83 DJC-10-50Gh Electronic Monitoring Assembly
84 CZ-315 socket
86 JQ201S-PLO/30A High and low light relay
87 JK981-007-XX Emergency steering switch
88 AH3-2OD(PF085A) Time relay

==========================

advantages

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. In Time Delivery Time, with competitive shipping cost
4. Stable stock for normal parts
5. Professional and on time after service

packing

1. Standard export carton packaging
2. Carton packaging on wooden pallets
3. Customized packaging according to customer requirements

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us