229000566 warm-up assembly XCMG XS395 road roller spare parts

Short Description:

229000566 Warm-up Assembly is an original dedicated engine preheating component for XCMG XS395 heavy-duty road roller. Specially designed for the cold-start demand of large-tonnage compaction equipment, this assembly features fast heating speed, stable constant temperature performance and strong low-temperature resistance. It effectively preheats the engine intake system and fuel circuit in low-temperature environments, reduces cold-start wear, optimizes combustion efficiency, and guarantees reliable startup and stable idle operation of XS395 roller in cold winter and high-altitude construction scenarios.

Product Detail

Product Tags

description

Part number: 229000566
Part name:  warm-up assembly
Unit name: electrical system
Applicable Models: XCMG XS395 vibratory roller

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Number Parts Name Material Encoding
1 FUSE BOX 803604774
2 FUSE 813509101
3 SCREW M5×16 805141408
4 WASHER 805338835
5 WASHER 805300185

=======================================

advantages

  • Low-temperature Quick Start Support: Customized for XS395 heavy roller’s large-displacement engine, it achieves rapid and uniform preheating in ultra-low temperature environments, effectively solving the problems of difficult startup and flameout in cold weather for large-tonnage compaction equipment.
  • Engine Wear Reduction: Moderate and constant-temperature preheating reduces dry friction of internal engine parts during cold start, lowers mechanical loss and fuel consumption caused by incomplete combustion, and extends the service life of the engine core assembly.
  • Strong Construction Environment Adaptability: Adopting shock-resistant and sealed structure, it adapts to long-term strong vibration of heavy-duty rolling and harsh outdoor environments such as cold, dusty and humid conditions, with stable working performance and low failure rate.
  • Original Vehicle Precision Matching: Fully compliant with XS395 roller’s original electrical parameters, mounting dimensions and control logic, supporting direct plug-and-play replacement without circuit modification or parameter debugging, with high compatibility and convenient maintenance.

FAQ

1. What kind of construction scenarios require frequent use of this warm-up assembly?
It is essential for winter low-temperature construction, early morning low-temperature startup in autumn and winter, high-altitude low-pressure and cold environments, and long-term shutdown and restart of equipment. It is a necessary component to ensure normal operation of XS395 roller in off-season cold weather engineering projects.
2. What is the difference between XS395 dedicated warm-up assembly and ordinary universal models?
Different from universal warm-up parts with low power, this dedicated assembly is calibrated for the large-displacement engine load of XS395 heavy roller. It has higher heating efficiency, more accurate constant temperature control, stronger vibration resistance, and will not cause insufficient preheating or overheating protection failure during long-term construction.
3. What problems will be caused by faulty warm-up assembly?
A failed warm-up assembly will lead to difficult engine cold start, frequent startup failure, unstable idle speed and obvious jitter after startup. It will also cause incomplete fuel combustion, increased exhaust smoke, serious carbon deposition in the engine, aggravated wear and higher fuel consumption.
4. When should the warm-up assembly be replaced?
Replace it in time if the preheating function fails completely, heating speed is significantly slower than normal, preheating temperature is insufficient leading to difficult startup, or internal aging and damage cannot be repaired to restore normal preheating performance.

logistics and transportation

We will choose the most favorable logistics method for customers, and we can also specify the logistics method according to customer needs.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us