35B0097 Torque converter oil temperature gauge Liugong CLGB320C bulldozer spare parts

Short Description:

Product advantages:

1. High -quality products.

2. Select high -quality materials.

3. More accurate matching size.

4. Reduce the risk of damage.

5. Factory sells directly, price discounts.

6. Complete Range of Spare Parts.


Product Detail

Product Tags

description

Part number: 35B0097
Part name: Torque converter oil temperature gauge
Unit name: 49C0134 Oil Temperature Gauge
Applicable Models: Liugong CLGB320C crawler bulldozer

35B0097 Torque Converter Oil Temperature Gauge is a dedicated original temperature monitoring instrument matched for LIUGONG CLGB320C heavy-duty bulldozer. Adopting high-precision temperature sensing elements and anti-vibration integrated structure, this oil temperature gauge features sensitive induction, accurate temperature feedback and stable display performance. Installed on the bulldozer instrument panel, it continuously tracks the real-time oil temperature of the torque converter during heavy-load operation. It fully adapts to the harsh working conditions of CLGB320C bulldozer such as long-time heavy-load earthmoving, continuous high-intensity operation, body high-frequency vibration and complex outdoor temperature changes. It effectively solves common monitoring faults such as temperature data deviation, display jitter, slow response and no display caused by aging or inferior gauges, helping operators timely discover overheating risks and prevent torque converter power attenuation and component damage.

ITEM/PART NO./PART NAME

1 08C7889 HARNESS 1
2 35B0097 OIL TEMP GAUGE

=======================================

advantages

  • High-precision Temperature Sensing, Accurate Monitoring: Built-in high-sensitivity precision temperature sensing components, with low detection error and fast response speed. It can truly and accurately feed back the real-time oil temperature of the torque converter, providing reliable data support for judging transmission system operating status and avoiding hidden overheating troubles.
  • Professional Anti-vibration Structure, Stable Display: Optimized internal reinforcement and anti-shake design for the long-term vibration characteristics of bulldozer heavy-load operation. The dial data will not jitter or drift during construction, maintaining clear and stable display effect for a long time.
  • Strong Environmental Adaptability, Low Failure Rate: Adopting dust-proof, moisture-proof and anti-electromagnetic interference structure, it can adapt to dusty, humid and variable temperature construction sites. It works stably in complex working environments without data disorder or monitoring failure.
  • Original Standard Matching, Easy Maintenance and Replacement: Fully compliant with the original installation size, wiring interface and electrical parameters of LIUGONG CLGB320C bulldozer. It supports direct in-situ replacement without wiring modification or parameter debugging, quickly restoring the real-time temperature monitoring function of the torque converter.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us