47C0289 High-back seat Liugong CLGB320C bulldozer spare parts
description
Part number: 47C0289
Part name: High-back seat
Unit name: 46E0049 Driver’s Seat
Applicable Models: Liugong CLGB320C crawler bulldozer
Compatible with LiuGong Bulldozer CLGB320C. Suitable for heavy‑duty continuous operation such as open‑pit mine pushing, earth‑rock stripping, large‑scale site leveling and dam filling. Applied for collapsed backrest, worn & torn cover, poor shock‑absorbing rebound, jammed adjusting handle and cab interior maintenance. Fit for original spare‑part replacement, overseas project maintenance in Middle East and Southeast Asia, riding‑assembly service for CLGB320C bulldozer cab.
ITEM/PART NO./PART NAME
1 00D3059 BRACKET 1
2 47C0289 SEAT 1
3 06B0395 WASHER 4 30823
4 00B0540 BOLT 4 M8×30-10.9-ZN.D
5 06B0397 WASHER 4 31232
6 00B0238 BOLT 4 M12×30-10.9-ZN.D
=======================================
advantages
- Heightened backrest offers good waist‑back wrapping support, reduces strain for long‑time heavy‑load mine operation
- Wear‑resistant tear‑proof surface fabric resists dust and silt erosion for bulldozer harsh dusty site environment
- Base mounting holes, safety‑belt interface and wiring connectors fully match OEM part for direct interchange without cab‑bracket modification
- Built‑in slide & angle locking mechanism with clear gear and firm lock, prevents seat shifting and shaking during operation.
FAQ
Q: Is separate sponge‑cover replacement acceptable if only seat foam & cover are damaged while base and shock absorber are intact?
A: Sponge and cover can be replaced separately with intact base and shock absorber. Overall mechanism inspection is recommended for mine heavy‑load condition to avoid sudden failure.
Q: What should be checked firstly for shaking after new high‑back‑seat installation?
A: Inspect deformed floor support, insufficient bolt torque and damaged bottom rubber shock pad first, retighten and test after troubleshooting.
warehouse
We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.
our warehouse

Pack and ship

- Aerial Boom Lift
- China Dump Truck
- Cold Recycler
- Cone Crusher Liner
- Container Side Lifter
- Dadi Bulldozer Part
- Forklift Sweeper Attachment
- Hbxg Bulldozer Parts
- Howo Engine Parts
- Hyundai Excavator Hydraulic Pump
- Komatsu Bulldozer Parts
- Komatsu Excavator Gear Shaft
- Komatsu Pc300-7 Excavator Hydraulic Pump
- Liugong Bulldozer Parts
- Sany Concrete Pump Spare Parts
- Sany Excavator Spare Parts
- Shacman Engine Parts
- Shantui Bulldozer Clutch Shaft
- Shantui Bulldozer Connecting Shaft Pin
- Shantui Bulldozer Control Flexible Shaft
- Shantui Bulldozer Flexible Shaft
- Shantui Bulldozer Lifting Cylinder Repair Kit
- Shantui Bulldozer Parts
- Shantui Bulldozer Reel Shaft
- Shantui Bulldozer Reverse Gear Shaft
- Shantui Bulldozer Spare Parts
- Shantui Bulldozer Winch Drive Shaft
- Shantui Dozer Bolt
- Shantui Dozer Front Idler
- Shantui Dozer Tilt Cylinder Repair Kit
- Shantui Sd16 Bevel Gear
- Shantui Sd16 Brake Lining
- Shantui Sd16 Door Assembly
- Shantui Sd16 O-Ring
- Shantui Sd16 Track Roller
- Shantui Sd22 Bearing Sleeve
- Shantui Sd22 Friction Disc
- Shantui Sd32 Track Roller
- Sinotruk Engine Parts
- Tow Truck
- Xcmg Bulldozer Parts
- Xcmg Bulldozer Spare Parts
- Xcmg Hydraulic Lock
- Xcmg Transmission
- Yuchai Engine Parts







