803809673 battery distribution box XCMG XS135 road roller spare parts

Short Description:

Battery distribution box is an important power‑distribution component of road‑roller electrical system. It integrates main‑circuit fuses and wiring terminals to distribute current for whole‑vehicle circuits and provide overload protection, preventing electrical equipment damage caused by short‑circuit fault.


Product Detail

Product Tags

description

Part number: 803809673
Part name: battery distribution box
Unit name:  control system
Fit for XCMG road roller XS135, suitable for rural road construction, subgrade backfill and small‑site compaction. Used to replace original battery distribution box with burn damage and broken terminals.

Burnt housing, oxidized terminals and damaged fuse holder will lead to unstable power supply, power cut of electric components and circuit heating. In severe cases, it brings fire risk and causes startup failure of road roller.

Number Parts Name Quantity Material Encoding
1 COVER 1
2 M6 HEXAGONAL FLANGE LOCK NUT 1
3 M5NUT 12
3 M5PLAIN WASHER 12
3 M5SPRING WASHER 12
4 100AFUSE 1 860597960
4 60AFUSE 1 860597958
4 150A FUSE 1 860597961
4 80AFUSE 1 860597959
4 30AFUSE 2 860597957
5 CONNECTING DISC4 1
6 M6 SQUARE BOLT 1
7 M5 SQUARE BOLT 12
8 LOWER COVER 1
9 M8 HEXAGONAL FLANGE LOCK NUT 1
10 CONNECTING DISC3 1
11 M8 SQUARE BOLT 1
12 BOTTOM BOARD 1

====================================

advantages

  • Mounting holes and terminal layout fully match original machine, harness connectors can be directly connected without modifying whole‑vehicle circuit.
  • Good insulation housing resists dust and mud intrusion, adapts to dusty and humid site working environment.
  • Reasonable internal circuit layout provides reliable overload protection, reduce electrical faults caused by short‑circuit and protect on‑board electric components.
  • Core electrical part of machine, convenient for bulk stocking, integral on‑site replacement shortens downtime, meet spare‑parts stocking demand for overseas projects in Southeast Asia and Africa.

maintenance & replacement

  • Disconnect battery negative pole before disassembly to avoid short‑circuit spark and personal or component damage.
  • Mark each harness during removal to prevent wrong connection, clean dust and rust impurities on mounting base.
  • Fasten harness terminals tightly, avoid virtual connection to prevent terminal burning caused by high‑current heating.
  • Check housing sealing after assembly, confirm normal circuit conduction before reconnecting battery for test.
  • Do not repair and reuse box with melted housing, heavily burnt terminals or damaged internal circuit, replace battery distribution box directly.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us