Crankshaft combination set XCMG XS365 road roller spare parts

Short Description:

Crankshaft combination set is the core transmission component of road roller engine. It converts piston reciprocating motion into rotating torque to output power for machine operation. The set includes crankshaft, bearing shells, thrust washers and other matching accessories.


Product Detail

Product Tags

description

Part number: -
Part name: Crankshaft combination set
Unit name: engine mounting assembly
Fit for XCMG road roller XS365, suitable for large‑scale infrastructure subgrade, high‑grade highway and large‑site backfill compaction construction. Used to replace original crankshaft combination set with wear, burning and deformation.

Scuffed journal, burnt surface and bent crankshaft will cause abnormal engine noise, low oil pressure and severe power loss. Seizure may occur in serious cases and lead to sudden machine shutdown.

*Due to the wide variety of products, the pictures displayed may not match the actual ones, and the part numbers are mainly used.

Number Parts Name Material Encoding
1 CRANKSHAFT ASSEMBLY
2 ROUND PIN 860541857
3 CRANKSHAFT TIMING GEAR 860541858

 

=======================================

advantages

  • Journal dimension and crank rotation parameters fully match original engine. Assembly clearance meets factory standard without extra machining correction.
  • Base material adopts quenching‑tempering heat treatment. Wear‑resistant journal surface resists impact and alternating load, adapts to long‑time heavy‑load operation of large‑tonnage road roller.
  • High‑precision matching bearing shells and thrust washers maintain proper oil‑film clearance, reduce risk of bearing seizure and extend engine overhaul cycle.
  • Core overhaul kit for engine, suitable for overseas project stock for engine repair, meet spare‑parts stocking demand for overseas projects in Middle East and Africa.

maintenance & replacement

  • Crankshaft combination set belongs to overhaul parts. Complete engine block disassembly is required, keep all components clean.
  • Thoroughly clean oil passages before installation to remove iron scraps and dirt and avoid lubrication failure caused by blocked oil path.
  • Do not reuse old bearing shells and thrust washers. Strictly control bearing clearance and crankshaft axial clearance according to service manual.
  • Tighten connecting rod bolts and main bearing bolts step‑by‑step with specified torque and angle. One‑step full tightening is forbidden.
  • Rotate crankshaft manually after assembly for smooth rotation without jamming. Fill engine oil before test run. Do not repair and reuse bent, burnt or scuffed crankshaft, replace crankshaft combination set directly.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship

  • Previous:
  • Next:

  • Write your message here and send it to us