Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our products are broadly identified and trustworthy by people and may meet continually modifying financial and social requires of Komatsu Pc400-7 Hydraulic Pump, Kalmar Reach Stacker Spare Parts, Xcmg Oil Sensor, And there are also a lot of overseas close friends who came for sight seeing, or entrust us to buy other stuff for them. You will be most welcome to come to China, to our city and to our manufacturing facility!
Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC Detail:

discharge port

Because there are many kinds of spare parts, we can’t display them all on the website. Please feel free to contact us for specific ones

Advantage

1. We supply both original and aftermarket products for you
2. From the manufacturer to the customer directly, saving your cost
3. Stable stock for normal parts
4. In Time Delivery Time, with competitive shipping cost
5. Professional and on time after service

Packing  

Carton Boxes, or according to clients’ request.

description

How to correctly judge if the discharge port is blocked

In the normal construction process, if the discharge port is suddenly blocked, it can be judged by the following phenomena: The concrete feeding of the concrete pump stops running and is accompanied by obvious sound changes and violent vibrations. At this time, the concrete pump is conveying There is no vibration in the pipeline. If the staff finds the above phenomenon, then they can draw a definite conclusion: the discharge port is blocked.

How to deal with the discharge port being blocked by concrete

Once the concrete pump is blocked, the operator can immediately take the following measures to restore the pump to its normal state: quickly fill the hopper with cement slurry, then jog to control the reverse operation of the concrete pump, and then electrically control the forward operation of the concrete pump. Repeat several times until the pipeline is unblocked. If the pipeline is still not unblocked at this time, the worker can disassemble the outlet connecting pipe, remove the debris that blocks the pipeline, restore the pipeline, and finally start the concrete pump.

When the staff inspects the pump in operation, they can check the size of the load by looking at the motor current of the concrete pump. As the load of the concrete pump increases, the motor current will increase. As the load decreases, the motor current will decrease. The change of the motor current is a true reflection of the load change of the concrete pump, and it is very simple and effective to check.

our warehouse

our warehouse

Pack and ship

Pack and ship

Product detail pictures:

Factory Cheap Hot  Solar 55 Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures

Factory Cheap Hot  Solar 55 Hydraulic Pump  - discharge port for concrete pump spare parts – CCMIC detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" will be the persistent conception of our company to the long-term to establish together with customers for mutual reciprocity and mutual gain for Factory Cheap Hot Solar 55 Hydraulic Pump - discharge port for concrete pump spare parts – CCMIC , The product will supply to all over the world, such as: New Zealand, azerbaijan, Serbia, we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
5 Stars By Edith from Manila - 2017.10.25 15:53
Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
5 Stars By Madeline from Uganda - 2018.09.23 18:44
Write your message here and send it to us