803682047 central electric control box for XCMG XP203 pneumatic-tyred roller

Short Description:

803691833 Key Switch is an original ignition and power control switch for construction machinery, used to control the on-off of the whole machine circuit, ignition start and safety protection.

Product Detail

Product Tags

description

Part number: 803682047
Part name: central electric control box
Unit name: electric control box assembly
Applicable Models: XCMG XP203 pneumatic-tyred roller

Suitable for loaders, road rollers and other construction machinery. It operates stably under harsh working conditions such as vibration, dust, humidity and large temperature difference, ensuring reliable operation of the electrical system.
Number Parts Name Quantity Material Encoding
1 RELAY 8 803751471
2 BLINK RELAY 1 860135376
3 RELAY 1 803751475
4 FUSE 6 803604632
5 10A FUSE 8 803604257
803694519 FUSE 10A 8 803694519
803604634 FUSE 10A 8
6 15A FUSE 2 803604258
803604635 FUSE 15A 2 803604635
7 20A FUSE 3 803604264
803696192 FUSE 20A 3 803696192
8 FUSE 25A 3 803604637
9 FUSE 2 803604260
803604638 FUSE 30A 2 803604638
10 CENTRAL ELECTRICAL CONTROL BOX COVER 1 860508773

advantages

  • Integrated structure realizes centralized control of the whole electrical system, with clear wiring and convenient maintenance.
  • High-level sealing and dustproof design, suitable for outdoor and harsh construction environment.
  • Equipped with reliable fuses and relays to provide effective overload and short circuit protection.
  • Strong anti-vibration and anti-interference performance, stable operation under long-term working vibration.
  • Original standard interface and size, direct replacement with high compatibility.

maintenance & replacement tips

  • Disconnect the power supply before inspection or replacement to prevent short circuit or electric shock.
  • Regularly check for water ingress, dust accumulation, loose wiring or abnormal heating, and clean or replace in time.
  • Check wiring harnesses and connectors for aging or damage; replace them together if necessary to ensure stable connection.
  • Install in the correct position and keep the sealing structure intact to avoid moisture and dust entering.
  • After installation, restore power and test each circuit function to confirm normal operation without abnormal alarms.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship




  • Previous:
  • Next:

  • Write your message here and send it to us