803691833 key switch for XCMG XP203 pneumatic-tyred roller

Short Description:

225703097 Electric Control Box Assembly is an original electrical control assembly for construction machinery, used for centralized circuit management, power distribution and signal control to ensure stable operation of the electrical system.

Product Detail

Product Tags

description

Part number: 803691833
Part name: key switch
Unit name: electric control box assembly
Applicable Models: XCMG XP203 pneumatic-tyred roller

803691833 Key Switch is a special original control switch suitable for loaders, road rollers, excavators and other engineering equipment. Adopting high-precision internal contacts, wear-resistant lock cylinder and anti-vibration structure, it features stable conduction, reliable locking, long service life and good safety. It realizes gear control such as power on, preheating, starting and power off, ensuring safe and standardized operation of the equipment. Adapted to vibration, dust, humidity and other harsh construction site environments, it effectively solves problems such as poor contact, difficulty in starting, failure to power on and automatic power failure caused by wear or damage of the key switch, ensuring normal and reliable operation of the whole machine.

Core Product Advantages

Number Parts Name Quantity Material Encoding
1 CENTRAL ELECTRIC CONTROL BOX 1 803682047
2 KEY SWITCH 1 803691833
3 COMBINATION METER 1 803546698
4 SWITCH PLATE 1
5 PLUG 2 801904165
6 SWITCH ASSEMBLY 1

advantages

  • Stable contact & long service life: High-quality internal contacts, not easy to ablate or loose.
  • Reliable locking & anti-theft: Standard matching key and lock cylinder, with good anti-theft performance.
  • Multi-gear control: Accurately realizes power on, preheating, start and stop functions.
  • Strong anti-vibration & anti-interference: Stable structure, not easy to misoperate under vibration.
  • Original standard matching: Direct replacement with accurate interface and good compatibility.

maintenance & replacement tips

  • Regularly check for loose wiring, poor contact, difficulty in rotating or jamming; replace the key switch in time.
  • Disconnect the power supply before installation to avoid short circuit.
  • Correctly connect the wiring according to the original circuit to ensure the gear functions are normal.
  • After installation, test each gear in sequence to confirm normal power on, starting and power off.
  • Keep the lock cylinder clean and avoid dust or water entering to extend service life.

warehouse

We have built four spare parts warehouses in Xuzhou, Jining, Kunshan and Changsha to provide customers from all over the world with a variety of high-quality spare parts. We can basically ship self-provided spare parts within three days after confirming the order. If the spare parts need to be adjusted or processed, they will be shipped within 7-30 days.

our warehouse

our warehouse

Pack and ship

Pack and ship




  • Previous:
  • Next:

  • Write your message here and send it to us